On 12 September 2020 a massive storm hit the Iberekodo Leprosy Settlement. The storm left the site without electricity, water storage tanks blown down and a lot of damage to the roof and ceilings of the residential units.

We praise God that nobody was injured, however we had a big task ahead of us to get the repairs done and the settlement back to a safe environment needed for the occupants.

September 2020 storm damage